J.K. Developers — Building a Green Community with Zero-Waste Living

Case Study: STP – 120 KLD | OWC – 600 kg/day for J.K. Developers Gurugram

View All Case Studies Discuss Your Project

Project Overview

Client

J.K. Developers

Location

Gurugram, Haryana

Project Type

Design & Implementation of STP + OWC Integrated Waste Management System

Sector

Real Estate (Residential Township)

Capacity

STP – 120 KLD | OWC – 600 kg/day

Compliance Body

CPCB/SPCB

The Challenge

J.K. Developers had launched a luxury residential project spread over 10 acres, accommodating more than 450 flats. With daily water consumption exceeding 150,000 liters and 500–600 kg organic waste generation, they faced serious sustainability challenges during occupancy planning:

Non-availability of a centralized sewage line from the local authority
High waste disposal cost & odor complaints from nearby residents
Need for in-house recycling system to obtain Occupancy Certificate (OC) under HSPCB norms
Need for a compact, automatic, low-maintenance solution capable of treating both wastewater and solid waste while meeting sustainability and compliance targets.

Kirimawasu’s Solution

Kirimawasu designed and commissioned an integrated environmental management system combining:

Sewage Treatment Plant (STP)

Technology

MBBR-based compact STP with tertiary filtration

Capacity

120 KLD

Reuse Application

Gardening, flushing, and road cleaning

Features

Automatic sludge dewatering & odorless operation



Organic Waste Composter (OWC)

Capacity

600 kg/day automatic rotary composter

Features

Inbuilt shredder, heater, and moisture control

Compost Output

120–150 kg/day reusable organic manure



Integration Highlights

✔ Shared PLC panel for real-time monitoring

✔ Odor control through activated carbon filters

✔ Fully compliant with CPCB Solid Waste Management Rules (2016)

✔ Green Area irrigation linked to treated water tank

Performance Improvements

Parameter Before After Improvement
Waste Disposal100% to landfill< 5%95% Reduction
Water ReuseNil65% reuse65% Savings
Monthly Utility Cost₹1,25,000₹52,00058% Reduction
Odor & HygienePoorExcellentFully Resolved
Compost UtilizationNil150 kg/day used in landscaping100% Waste Reuse

Compliance Impact

~38 tons CO₂e/year

Carbon Footprint Reduction

14 Months

Payback Period

Pre-certified IGBC Gold Category

Green Rating

Client Testimonial

“Kirimawasu’s integrated waste management solution helped us achieve true sustainability. The STP and OWC systems are compact, efficient, and visually neat — enhancing both compliance and brand image.”

Outcome Summary


This project demonstrates how real-estate developers can achieve Zero-Waste Living Communities by integrating smart environmental technologies. Through advanced automation, odor control, and efficient reuse cycles, J.K. Developers now operates one of Gurugram’s most sustainable residential complexes.

The success of this model is now inspiring multiple upcoming housing projects to adopt Kirimawasu’s Zero-Waste Township Design Framework.